Mozambique:
Consultancy Services for Design of OHL 110 kV Connecting Mavuzi and Chibabava and Related Substations under Rural Electrification of Chibabava Buzi Districts in Sofala Province
The project was intended to contribute to the increase of the electricity access rate (12% at that time) and to contribute to poverty reduction by ensuring adequate electricity supply to support the growth of local industries and trade and to create employment opportunities.
Services
- Detailed design, technical specifications and tender documents
- Coordination and supervision for the preparation of an ESIA
- Assistance during tendering and contract award
- Site supervision, management of EPC contracts
- Monitoring of environmental issues and quality control
- Factory acceptance testing, site testing, commissioning and handing over
Technical Data
- 90 km of new 110 kV OHL with river crossing (500 m span length)
- Replacement of switchgear, protection and control in one substation
- Specification for one new 110/33 kV substation and its 33 kV line-in
Client:
Electricidade de Moçambique, E.P. (EDM)
Financing:
European Union
Period:
2009 - 2016