Azerbaijan:
220 kV Double-Circuit Transmission Lines Power Plant Shimal Dres to Hovsani Substation and to Sanaye Govshagi (Sumgait) (220 kV Mingechavir - Absheron Transmission Project)

The assignment is an extension of the earlier "220 kV Mingechavir - Absheron Transmission Line Project" and covers additional works and equipment to further reinforce the stability of the system and to secure electricity supply in the region.


Services
  • Feasibility study
  • Technical specifications 
  • Tender documents and evaluation of bids 
  • Project management and site supervision 
     
Technical Data
  • One new 220/110 kV substation
  • Two new 220 kV lines (99 km in total)
  • Extension of two 220 kV switchyards 
  • Associated measures for substation integration into the SCADA system
     

Client:
Azerenerji JSC
Financing:
Azerenerji JSC
Period:
2009 - 2012
Back to list