Azerbaijan:
220 kV Double-Circuit Transmission Lines Power Plant Shimal Dres to Hovsani Substation and to Sanaye Govshagi (Sumgait) (220 kV Mingechavir - Absheron Transmission Project)
The assignment is an extension of the earlier "220 kV Mingechavir - Absheron Transmission Line Project" and covers additional works and equipment to further reinforce the stability of the system and to secure electricity supply in the region.
Services
- Feasibility study
- Technical specifications
- Tender documents and evaluation of bids
- Project management and site supervision
Technical Data
- One new 220/110 kV substation
- Two new 220 kV lines (99 km in total)
- Extension of two 220 kV switchyards
- Associated measures for substation integration into the SCADA system
Client:
Azerenerji JSC
Financing:
Azerenerji JSC
Period:
2009 - 2012