Azerbaijan:
330 kV Transmission Project Azdrez - Imishli

Most of Azerbaijan's generation facilities are in the central and western part of the country, whereas most consumers are located in the eastern part, especially on Absheron Peninsula and the capital city Baku. KfW Development Bank supported Azerenerji with the extension, rehabilitation and upgrade of their transmission system, which at that time suffered from frequent outages and did not fulfil the n-1 criterion.


Services
  • Design report
  • Technical specifications and tender documents
  • Assistance during tendering and contract award
  • Site supervision
Technical Data
  • One new 330 kV substation at Goranboy
  • 150 km of 330 kV transmission line
  • Expansion and rearrangement of the existing 330 kV Imishli Substation
  • Associated measures for integration and connection of the new components to the SCADA and protection systems
     

Client:
Azerenerji JSC
Financing:
KfW Development Bank
Period:
2007 - 2016