Kosovo:
Development of the Energy Sector IV and V - Improvement of Transmission Network
The overall objective of this project was to prepare the country's transmission system for its integration into ENTSO-E, the European Network of Transmission System Operators for Electricity. For this behalf, the system infrastructure equipment needed rehabilitation or upgrade.
Services
- Technical specifications and tender documents
- Assistance during tendering and bid evaluation
- Works supervision, quality control, FATs, performance testing and commissioning,
- Environmental, social, health and safety monitoring
- Management of 4 EPC contracts
Technical Data
- New power transformers (400/110 kV, 300 MVA) in two substations
- Replacement of 110 kV AIS by GIS outdoor switchgears
- Installation of additional line bays
- Rehabilitation of auxiliary systems and SCADA, installation of metering groups
- Construction of one new 110 kV line and revitalisation of an existing 110 kV line
Client:
KOSTT - Transmission, System and Market Operator J.S.C.
Financing:
KfW Development Bank
Period:
2014 - 2017