Kosovo:
Development of the Energy Sector IV and V - Improvement of Transmission Network

The overall objective of this project was to prepare the country's transmission system for its integration into ENTSO-E, the European Network of Transmission System Operators for Electricity. For this behalf, the system infrastructure equipment needed rehabilitation or upgrade.


Services
  • Technical specifications and tender documents
  • Assistance during tendering and bid evaluation 
  • Works supervision, quality control, FATs, performance testing and commissioning, 
  • Environmental, social, health and safety monitoring
  • Management of 4 EPC contracts
Technical Data
  • New power transformers (400/110 kV, 300 MVA) in two substations
  • Replacement of 110 kV AIS by GIS outdoor switchgears
  • Installation of additional line bays
  • Rehabilitation of auxiliary systems and SCADA, installation of metering groups
  • Construction of one new 110 kV line and revitalisation of an existing 110 kV line

Client:
KOSTT - Transmission, System and Market Operator J.S.C.
Financing:
KfW Development Bank
Period:
2014 - 2017
Back to list