Ukraine:
Modernization of Substations in Eastern Europe

The project aimed at rehabilitating urgently needed substations including feeders of connected transmission lines in the east of Ukraine and at improving the reliability of the related interconnection equipment.


Services
  • Preparation of tender documents and assistance during tendering, preparation of contracts for 4 lots
  • Preparation of a bankable feasibility study and a TEO (local techno-economic study according to Ukrainian law and required for approval procedure)
Technical Data
  • Replacement of the 330 and 750 kV outdoor switchgear equipment at the 750 kV Zaporizka and Dniprovska Substations
  • Installation of 330 and 110 kV GIS bays in Kharkivska Substation
  • Replacement of 110, 35 and 6 kV indoor equipment in Zalyutino Substation
  • Partly replacement of the 750, 330 and 110 kV RPA devices in all 4 substations

Client:
Ukrenergo
Financing:
KfW Development Bank
Period:
2015 - 2020