Kosovo:
Transmission Development Project - Consultant for the Project Preparation Support

The project aimed at strengthening the transmission network, improving interconnection, complying with the grid code and fulfilling the N-1 criterion in order to become a member of the ENTSO-E network.


Services
  • Elaboration of technical specifications and tender documents
  • Support during tendering and award
Technical Data
  • Various new power transformers, 220 & 110 kV indoor GIS/hybrid GIS
  • Four 110 kV transmission systems (OHL + UG cables)
  • One 220 kV OHL

Client:
KOSTT - Transmission, System and Market Operator J.S.C.
Financing:
European Bank for Reconstruction and Development (EBRD)
Period:
2015 - 2016