Kosovo:
Transmission Development Project - Consultant for the Project Preparation Support
The project aimed at strengthening the transmission network, improving interconnection, complying with the grid code and fulfilling the N-1 criterion in order to become a member of the ENTSO-E network.
Services
- Elaboration of technical specifications and tender documents
- Support during tendering and award
Technical Data
- Various new power transformers, 220 & 110 kV indoor GIS/hybrid GIS
- Four 110 kV transmission systems (OHL + UG cables)
- One 220 kV OHL
Client:
KOSTT - Transmission, System and Market Operator J.S.C.
Financing:
European Bank for Reconstruction and Development (EBRD)
Period:
2015 - 2016