Germany:
Engineering Services for 110 kV Cables for the New "Vulkanstrasse" Substation in Duisburg
The project includes the consolidation of three existing substations into a new 110/10 kV substation "Vulkanstrasse" for the implementation of the 110 kV target grid planning and due to the renewal of operating equipment.
Services
- Services phases 1 to 8 of HOAI (German official scale of fees for services by architects and engineers)
- Basic evaluation, site investigation, preliminary planning with cost estimate
- Preliminary design, detailed design
- Preparation and participation in contract award: specifications, evaluation of bids, participation in negotiations with bidders, award recommendation
- Construction supervision and cost control
Technical Data
- Several 110 kV XLPE cables, 3 x 1 x 500 or 800 mm³, NA2XS(FL)2Y
- Outer gas pressure / XLPE cable transition joints
- Civil engineering and construction measures
- Dismantling of old equipment and rerouting of cables from the old to the new installations
Client:
Stadtwerke Duisburg Netzgesellschaft mbH
Financing:
Stadtwerke Duisburg Netzgesellschaft mbH
Period:
2013 - 2019