The project includes the consolidation of three existing substations into a new 110/10 kV substation "Vulkanstrasse" for the implementation of the 110 kV target grid planning and due to the renewal of operating equipment.
Services
- Service phases 1 to 8 of HOAI (German official scale of fees for services by architects and engineers)
- Basic evaluation, site investigation, preliminary planning with cost estimate
- Preliminary design, detailed design
- Preparation and participation in contract award: specifications, evaluation of bids, participation in negotiations with bidders, award recommendation
- Construction supervision and cost control
Technical Data
- Building design
- New 110 kV GIS switchgear, double busbar with 16 bays (indoor switchgear)
- Installation of two 110/10 kV transformers and one 110/25 kV transformer
- New 10 kV switchgear (GIS), double busbar with 64 bays
- New 25 kV switchgear (GIS), double busbar with 4 bays
- Star point switchgear, 2 auxiliary power units, ripple control system and L-coil switchgear
Client:
Stadtwerke Duisburg Netzgesellschaft mbH
Financing:
Stadtwerke Duisburg Netzgesellschaft mbH
Period:
2011 - 2019